Sunday 1 May 2016

Ute Update

 Engine runs great better than I expected
 A/C & power steering all working
 Just need to remove electrical box and paint.
All legally compliance ready to go to tray builder.



Monday 22 February 2016

Update for my 75 Series Ute Build.


Engine in all but done. Just need the electrical done now.



Box made to hold computer.



Fuel system was an issue but all sorted now.


Very happy with the result can't wait to drive her.

Sunday 24 January 2016

Latest Update On My 75 Series Landcruiser Ute Build.

Spent this weekend assembling the guards & bonnet. It went together fairly well no real trouble.


Front with radiator support panel fitted


LHS



RHS





Still heaps to go. Hoping to get the radiator sorted this week.

Saturday 9 January 2016

Landcruiser 75 Series Ute Build - Exhaust Done

I took my ute to a local exhaust shop to get a custom system fitted. I felt this was the best idea as there is not much room at the sides of the engine. I still will need to fit some heat shields to protect the fuel lines and clutch slave cylinder.


Custom Made Extractors

Straight forward nothing to fancy.


Business End (should sound good)

Saturday 19 December 2015

Landcruiser 75 Series Rebuild - Cab On.


Big day yesterday but the cab is back on. I was a bit worried about the clearance between the engine and cab but all is good.




Sunday 6 December 2015

My 75 Series Landcruiser Ute with Engine and Gear Box Together and in.

I did heaps of research into the best way to fit the LS1 into my Landcrusier Ute chassis. I went with a Mark's Adaptor allowing me to sue the original gearbox and drive shafts. I DID GET THE GEARBOX OVERHAULED.

 The engine and gearbox fits neatly into the chassis.

I did have to modify the position of the alternator and A/C compressor. Once again Mark's Adaptors had all the required brackets. They all fitted without any problems.